Data Centre Replay
When should this job run?
Replay one flexible batch job within a single UTC day. Find the lowest-carbon window that meets its deadline, fits the site’s import limit and costs no more than its original run.
Free public preview. No sign-in. Your inputs stay in this tab.
Choose an operating day
Both examples use synthetic readings. Compare a variable tariff with a fixed €120/MWh tariff to see when shifting a job changes the bill.
Grid carbon intensity
Hourly average, g CO2/kWh. All times UTC.Operator comparison
| Measure | Original | Selected |
|---|
Method and limits
Facility MW for the job = IT MW × incremental PUE (a constant assumption). Multiply by hours for MWh. Each hour, multiply MWh by its tariff for the variable charge, and by its grid factor in g/kWh for kg CO2. The site imports its base load plus the job while it runs. Headroom is the smallest margin below the import limit during that window, using hourly averages.
The replay tests every contiguous whole-hour start between release and deadline. Among windows that satisfy capacity and cost constraints, it selects lowest attributed CO2, then lowest charge, then the original start if tied. An unchanged start is a valid result. Historical hindsight cannot guarantee a forecast. The operator must verify shorter-interval peaks, workload eligibility, redundancy, cooling, queue capacity, contract terms and actual completion before changing operations. Demand charges, on-site generation, electrical losses beyond PUE, embodied emissions and removals are outside this model.
Would this change how you schedule a job? Tell Gary which constraint or tariff your site would need to model.